= Mer QA process =
 
= Mer QA process =
 +
 +
Mer has two testing processes: package and release testing. Check the overall process [[Process|description]].
 +
 +
== Package testing ==
 +
 +
Package test content should be fast to execute, no long lasting or soak tests, and should test the changed package thoroughly.
  
 
[[Image:Mer_qa_process.png]]
 
[[Image:Mer_qa_process.png]]
Line 5: Line 11:
 
A contributor makes and submits a change which triggers the following process:
 
A contributor makes and submits a change which triggers the following process:
 
# BOSS notices the change in the gerrit
 
# BOSS notices the change in the gerrit
# BOSS delivers the changed package to OBS and OBS builds the package for all architectures
+
# '''Input''': BOSS delivers the changed package to OBS and OBS builds the package for all architectures. '''Output''': The build result
# The build result is reported back to BOSS
+
# If no errors in the building, send early notification. '''Output''': 'regress' / 'improvement' / 'no change' indicator from the vendors
# If no errors in the building, send test request notification to vendors
+
# If no errors in the early notification, send later notification: '''Output''': 'regress' / 'improvement' / 'no change' indicator from the vendors
# Get test results from the vendors
+
# Report results back to gerrit
# Report OBS and build results back to gerrit
+
  
 
<br />
 
<br />
Line 15: Line 20:
 
[[Image:Vendor qa process.png]]
 
[[Image:Vendor qa process.png]]
  
# A vendor receives a test request notification from the Mer QA
+
# A vendor receives a test request notification from the Mer QA (also sources of the changed packages?)
# The test request is delivered to the test execution planner
+
# '''Input''': Update changed packages to vendor OBS. '''Output''': Repository where to find the packages
# The test execution planner creates kickstart files, lists needed packages for testing and creates test plans for the OTS
+
# '''Input''': List of changed packages and test stage. '''Output''': Kickstart files, list of needed packages for testing and test plans for the OTS
# The kickstart files and list of required packages are delivered to image builder
+
# '''Input''': Kickstart file and needed packages. '''Output''': URL to image(s)
# Image builder creates testing images for all devices and returns image locations to BOSS
+
# '''Input''': Test plans and image locations. '''Output''': The test results
# Image locations and test plans are delivered to test automation, OTS
+
# Returning 'regress' / 'improvement' / 'no change' indicator to Mer QA
# After the test execution the test results are reported back to BOSS
+
# All results are delivered back to Mer QA
+
 
+
Mer has two testing processes: package and release testing. Check the overall process [[Process|description]].
+
 
+
== Package testing ==
+
 
+
Package test content should be fast to execute, no long lasting or soak tests, and should test the changed package thoroughly.
+
  
 
== Release testing ==
 
== Release testing ==

Latest revision as of 16:34, 6 May 2012

Contents

[edit] Mer QA process

Mer has two testing processes: package and release testing. Check the overall process description.

[edit] Package testing

Package test content should be fast to execute, no long lasting or soak tests, and should test the changed package thoroughly.

Mer qa process.png

A contributor makes and submits a change which triggers the following process:

  1. BOSS notices the change in the gerrit
  2. Input: BOSS delivers the changed package to OBS and OBS builds the package for all architectures. Output: The build result
  3. If no errors in the building, send early notification. Output: 'regress' / 'improvement' / 'no change' indicator from the vendors
  4. If no errors in the early notification, send later notification: Output: 'regress' / 'improvement' / 'no change' indicator from the vendors
  5. Report results back to gerrit


Vendor qa process.png

  1. A vendor receives a test request notification from the Mer QA (also sources of the changed packages?)
  2. Input: Update changed packages to vendor OBS. Output: Repository where to find the packages
  3. Input: List of changed packages and test stage. Output: Kickstart files, list of needed packages for testing and test plans for the OTS
  4. Input: Kickstart file and needed packages. Output: URL to image(s)
  5. Input: Test plans and image locations. Output: The test results
  6. Returning 'regress' / 'improvement' / 'no change' indicator to Mer QA

[edit] Release testing

(Pre) Release testing has two main test sets: core and feature set. Both sets are executed to every release.

Release testing can take more time than package testing, and it should include non-functional tests.

Core set

The Core set contains set of tests that verify overall quality of the Mer Core release. It has tests for all architecture domains and API tests. Core set content is stable, only minor changes are allowed between the releases.

Feature set

Feature set includes tests for those packages that have changed from the previous release. Basically feature set is set of package testing tests. The feature set content changes to every release.

[edit] Manual testing

  • QA Tools support manual testing.
  • When manual tests can be executed and how to report results
  • What is the testing process in manual testing

[edit] Reference QA processes

[edit] MeeGo

This is from the public side of the MeeGo!

  • No CI testing in place
  • Only hourly, nightly and release testing
  • QA-Reports was used to report test results
  • QA Tools were OTS, testrunner-lite, tdriver
  • MCTS tests were used

[edit] Maemo

Please fix if you see mistakes here.

  • Active CI testing in place
    • Test packaging was used, the naming policy was strict
    • Own dashboard for managing test packages
    • Test package had in the Debian control file following parameters
      • XB-Maemo-CI-Packages and XB-Maemo-CI-Stage
      • When test package was updated to the version control, the control file information was moved to database
    • When a package changed, tests that defined the package in the control file were executed
      • Test packages were installed into the testing image and test automation executed all tests found from the image
    • All tests from the test package were executed
      • Caused problems if the test package had long or many test cases
  • QA-tools were testrunner-lite, ots
    • OTS had hundreds of test requests per day